Opening Hour

Mon - Sun, 0:00 - 24:00

Call Us

+86-21-58386256

  • Operational Design Tips for the Drill and

    21-02-2019 · Maintain consistency in your hole angles. Where possible keep your drill pattern simple and avoid constantly changing hole angles in your design. Changing mast angle takes time and is not good for the drill. In terms of productivity if every second hole is a different angle most drillers will drill out the same angle until complete then

    Get Price
  • 14.3 Open Cast (Strip) Mining

    Area mining usually progresses in a series of parallel deep trenches referred to as furrows or strips that may exceed several thousand feet (1 km or more) in length (Fig. 14.3.0.1). Material is removed from the undisturbed area on the highwall side form-ing a deep trench. It is then placed in the open pit at the angle of repose forming a spoil

    Get Price
  • tambang: Ultimate Pit Definition

    The ultimate pit limit will represent the maximum boundary of all material meeting these criteria. The material contained in the pit will meet two objectives. A block will not be mined unless it can pay all costs for its mining processing and marketing and for stripping the waste above the block.

    Get Price
  • Optimized open pit mine design pushbacks and the gap

    OPTIMIZED OPEN PIT MINE DESIGN PUSHBACKS AND THE GAP PROBLEM—A REVIEW 511 JOURNAL OF MINING SCIENCE Vol. 50 No. 3 2014 Fig. 3. Graph G with dummy node x0 and arcs added from the dummy node x0 to all other nodes. It is clear from the definition of our graph G that a graph closure in G represents a physically feasible pit if not then a block not in our closure violating

    Get Price
  • Pit wall optimisation and effective wall management

    Pit wall optimisation and effective wall management strategies at Invincible Open Pit St Ives Gold Mines M Abdulai Gold Fields Australia Pty Ltd Australia PG Andrews Gold Fields Australia Pty Ltd Australia D McMahon Gold Fields Australia Pty Ltd Australia E Bona Gold Fields Australia Pty Ltd Australia J Walker Gold Fields Australia Pty Ltd Australia

    Get Price
  • Analysis of a slope failure in an open pit mine using

    Background; In 1996 a slope failure occurred at the Round Hill open pit mine operated by Macraes Mining Company Ltd. The failure as shown in Figure 1 involved three benches at an intermediate slope that was being pushed back towards the final high wall loion.

    Get Price
  • Heap leaching

    Heap leaching is an industrial mining process used to extract precious metals copper uranium and other compounds from ore using a series of chemical reactions that absorb specific minerals and re-separate them after their division from other earth materials. Similar to in situ mining heap leach mining differs in that it places ore on a liner then adds the chemicals via drip systems to the

    Get Price
  • A Framework for Open

    13-04-2021 · A Framework for Open-Pit Mine Production Scheduling under Semi-Mobile In-Pit Crushing and Conveying Systems with the High-Angle Conveyor Because HAC can transport material at a deep angle along the pit wall the conveyor belt length is minimized and no extra waste material needs to be mined.

    Get Price
  • Lerchs–Grossmann algorithm with variable slope angles

    05-09-2013 · Abstract. One of the most important design factors in open-pit mining is determination of the optimal pit. Pits may be redesigned many times during the life of a mine in response to changes in design parameters as more information is obtained and to changes in the values of technical and economic parameters.

    Get Price
  • Pit Optimization – How I View It

    03-06-2015 · Pit Optimization – How I View It. One of the first steps in open pit mine design is the pit optimization analysis. Pit optimization is used to define the most profitable pit shell (or nested pit shells) for a given set of economic parameters. The economic parameters include the metal prices process recoveries and operating costs.

    Get Price
  • Pit Wall Angles and Bench Width – How Do They Relate?

    10-05-2015 · The wall of an open pit wall will consist of a series of stacked benches. Geotechnical engineers will normally provide the pit slope design criteria based on the inter-ramp angle (“IRA”) for various sectors around the pit. The IRA represents the toe-to-toe slope angle

    Get Price
  • FutureSmart MiningTM

    Overview. Concentrating the Mine™ is looking to address the need for increased precision in mining with minimal energy water and capital intensity. We are applying technologies that more precisely target the desired metals or minerals delivering greater than 30% reductions in the use of water energy and capital intensity and producing

    Get Price
  • Surface Mining Techniques used in the Oil Sands

    01-05-2016 · Oil sands mining operations are some of the largest mines in the world. Although open-pit oil sands mines have a lot in common with traditional hard-rock mines (such as gold or copper) oil sands operators have some unique challenges due to the softness of the deposit. Learn more about surface mining techniques used in the oil sands.

    Get Price
  • Glossary of Mining Terms

    Angle of repose - The maximum angle from horizontal at which a given material will rest on a given surface without sliding or rolling. Anticline - An upward fold or arch of rock strata. Aquifer - A water-bearing bed of porous rock often sandstone. Arching - Fracture processes around a mine opening leading to stabilization by an arching effect.

    Get Price
  • Slope Design Considerations for Shallow Open Pit Mines: A

    03-10-2017 · In open pit mines the orebody is extracted from different benches which should be stable as the stability of slopes plays a critical role in reducing and controlling rock falls. Slopes in open pit mines are major geotechnical structures and can affect mining

    Get Price
  • Surface Mining Techniques used in the Oil Sands

    01-05-2016 · Oil sands mining operations are some of the largest mines in the world. Although open-pit oil sands mines have a lot in common with traditional hard-rock mines (such as gold or copper) oil sands operators have some unique challenges due to the softness of the deposit. Learn more about surface mining techniques used in the oil sands.

    Get Price
  • Air quality management: a mining perspective

    Mines can be classified as either underground mines or open pit mines. In some cases a combination of open pit and underground mining occurs although usually sequentially in the mine life-cycle rather than simultaneously. At underground mines the rock dumps tailings dams and load-out facilities are the main causes of dust emissions whereas

    Get Price
  • Tailings.info Deposition Methods of Tailings

    Dry stacking of tailings is normally carried out by a radial conveyor stacker or by truck (Davies and Rice 2001). Deposition techniques Tailings can be discharged using subaqueous (below water) or subaerial techniques (above the water line on the ground or on the tailings beach) (DPI 2003).

    Get Price
  • Open Pit Mining

    24-02-2018 · The Pit stretches 3.8 kilometers by 1.35 kilometers wide at the surface. And it goes down to a depth of 500 meters. Another example of very large open pit is given by these images taken from the Highland Valley copper mine in central British Columbia in Canada. In model 1 we learn that the metalliferous surface mine the slopes are referred as

    Get Price
  • Slope Design Considerations for Shallow Open Pit Mines: A

    03-10-2017 · In open pit mines the orebody is extracted from different benches which should be stable as the stability of slopes plays a critical role in reducing and controlling rock falls. Slopes in open pit mines are major geotechnical structures and can affect mining

    Get Price
  • Ultimate slope design in open pit phosphate mine using

    18-04-2019 · Open pit mining of the phosphate deposit in the Meknassy Basin particularly in Jebel Jebbeus requires slope design and stability analysis to maintain security and profitability. These processes depend on the geological and geomechanical characteristics of the open pit mine area. Therefore to identify these characteristics several studies (geological structural geotechnical) were

    Get Price
  • [PDF] Determination of Optimum Production Capacity and

    In modern mining industry with increasing competit ive environment and unit costs it is necessary to evaluate mineral resources optimally from the aspects of economy safety and e nvironment. On the other hand production increase is another reality and obligation for today’s mining operations. The activities related to the extraction of ore dep osit consist of risky operations which are

    Get Price
  • (PDF) Mining Methods: Part I

    The typical large open pit mining operation that has been in production for 10 years and more is Pit slope angle and stability and stacking the tailings away from the dredge pond.

    Get Price
  • Open

    The steepening of slope angles on an open pit mining operation has a material impact on improving the economics of mining. Steepening of slope angles can also increase the risk of slope failure. Slope failures are inherently costly events because they can be astrophic resulting in multiple fatalities equipment damage and temporary or permanent closure of a mine.

    Get Price
  • ThreeDify

    GeoMine QuickPit (QuickPit) is an advanced open pit design software for rapid pit design.QuickPit allows a mine planner to build a complete pit or dump design with ramps in a matter of minutes. Its parametric and incremental pushback/dump creation tools combined with unlimited undo/redo allows the mine planner to evaluate multiple designs and plans in the shortest time possible.

    Get Price
  • Practical waste rock dump and stockpile management in high

    Mining is a major industry in PNG and very large open pits have been constructed with excavated slope heights ranging from 300 to 1000 m. Open pit mine slopes are designed with a serviceable life of no more than 10 to 20 years. As such predicted and well-managed failures or landslides are usually considered acceptable.

    Get Price
  • Ultimate slope design in open pit phosphate mine using

    18-04-2019 · Open pit mining of the phosphate deposit in the Meknassy Basin particularly in Jebel Jebbeus requires slope design and stability analysis to maintain security and profitability. These processes depend on the geological and geomechanical characteristics of the open pit mine area. Therefore to identify these characteristics several studies (geological structural geotechnical) were

    Get Price
  • Sub

    Sublevel Open Stoping originated in the early 1900’s in iron ore mines in Michigan USA. It was developed over the years from a method originally known as short hole bench and train mining.Generally a large scale open stoping method it is often referred to as long hole or blast hole stoping. A Typical Sublevel Open Stoping Operation.

    Get Price
  • Slope Design Considerations for Shallow Open Pit Mines: A

    03-10-2017 · In open pit mines the orebody is extracted from different benches which should be stable as the stability of slopes plays a critical role in reducing and controlling rock falls. Slopes in open pit mines are major geotechnical structures and can affect mining

    Get Price
  • Analysis of a slope failure in an open pit mine using

    Background; In 1996 a slope failure occurred at the Round Hill open pit mine operated by Macraes Mining Company Ltd. The failure as shown in Figure 1 involved three benches at an intermediate slope that was being pushed back towards the final high wall loion.

    Get Price

Related Products